Union University Library
Four separate zones, including an attic space, were installed in this 60,000 sq. ft. project. A fire pump and standpipe/feed main now provide coverage for each of the four zones. It was a complex installation that included preset hangers, complicated architectural features, an aggressive completion schedule, harsh cold conditions and multiple pipe drops due to phasing of the floor construction. The project was a great success due to the expert coordination of our AFPG TEAM.