Millard Refrigerated Services
AFPG designed and installed the fire protection systems for Millard Refrigerated Service in Sunnyvale, Texas.
We completed Phase 1, 2 and 3 of this 45’ tall refrigerated warehouse since the project started in 2009. All storage is on racks with top of storage at 40’. Operating temperatures vary from -20 degrees Fahrenheit to 30 degrees Fahrenheit.
Phase 1 of the project consisted of installing 2,000 feet of 10" underground supply piping from the pump to three valve header locations, the installation of a 2,500 gallon per minute fire pump, five double interlock Quell Suppression Systems, and one wet system for the office area. 1,440 sprinklers were installed during this Phase.
Phase 2 and Phase 3 of this project consisted of the installation of eight additional double interlock Quell Suppression Systems with 2,100 additional sprinklers.
APi Systems Group also provided the fire alarm, mass notifications system, and linear detection systems for the project as a sub-contractor to Mutual.
Each Phase of this project was completed on time and within budget.