Bosque Schools
AFPGĀ installed a wet fire sprinkler system consisting of 255 pendant sprinklers for this new one story 18,500 square foot building. This was a Phase Two addition. S.A.F.E. , along with General Contractor Reid and Associates, completed this project ahead of schedule and within budget.
Building Information Modeling (BIM) was used in designing the fire sprinkler shop drawings and there were no costly conflicts with other trades.
This project was designed and installed in accordance with the International Building Code and included seismic bracing standards as now required throughout New Mexico and West Texas.